Ready For Inspection.
Joe Schaack helps Jim finish the braces on the wings. The oil
injection tank is installed and a double ground installed.
As soon as Brian hooks up the engine we will be ready to fly. The
engine is hung, struts
are on, gap seal on the wings are done, and the windshield is going on
today (Jan 13 05) along with the jury struts.
A good idea: when you get ready to hang your engine cover the tail with
a packing blanket. It will keep dropped tools from putting a hole in
your tail. You can get them at any moving store for less than 10 bucks.
Jim at an Erie place.
A great paint job on a great plane.
|